[College of ACES] [University of Illinois] [Illinois CES]

Re: Aeration Riser delay.

schrader@beaches.net
Thu, 26 Mar 1998 00:39:39 -0600


Your mention of tree tombs triggered a drowning thought. contained plant sites can leave in the question of effective drainage. I have found when the suspicion of water logging occures a pvc set to beyond the desired aireation of soil will fill with water and another of smaller diameter capped will rise in the event the water level rises. Its a good way to monitor such a problem.

"The Corridor" H.E.A.T. Highspeed Enclosed Automated Transport
Mans economical opportunity for ecological and social enhancement

Act Localy
Think Globaly

George schrader@beaches.net
American Tree
1309 W. 10th St.
Panama City, Fl 32401
Tel 904 769 4060
Portable 904 832 0274